ACH580 Ultra-Low Harmonic Drives Installation, Operation and Maintenance Manual
Unpack the drive
1. Unpack the drive.
2. Check for any damage and notify the shipper immediately if damaged components
are found.
3. Check the contents against the order and the shipping label to verify that all parts
have been received.
Tools required
To install the ACH580 Ultra-Low Harmonic Drives you need the following:
• Screwdrivers as appropriate for the mounting hardware used, including a
T20 Torx driver for drive cover removal
• Wire stripper
• Tape measure and/or provided mounting template
• Drill
• Use pallet truck and hoist
• Use the appropriate crimping tool for power cable lugs (if applicable).
• Mounting hardware: screws or nuts and bolts. The type, length and quantity of
hardware depends on the mounting surface and the frame size:
WARNING! Before installing the ACH580 Ultra-Low Harmonic Drives, ensure the
input power supply to the drive is off.
WARNING! Metal shavings or debris in the enclosure can damage electrical
equipment and create a hazardous condition. Where parts, such as conduit plates
require cutting or drilling, first remove the part. If that is not practical, cover nearby
electrical components to protect them from all shavings or debris.
Flange Mounting
Further information is in: Flange mounting kit supplement, 3AXD50000019100.
Frame size
3. Install the drive
Installing the drive vertically, frames R3, R6, R8
The figures show frame R3 as an example.
1. Mark the hole locations using the mounting template included in the package.
2. Drill the mounting holes.
R3
3AXD50000255726
R6
3AXD50000179633
R8
3AXD50000164318
Kit
ACH580 Ultra-Low Harmonic Drives Installation
11