Download Print this page

ABB ACH580 Series Installation, Operation And Maintenance Manual page 102

Ultra-low harmonic drives
Hide thumbs Also See for ACH580 Series:

Advertisement

102
UL Type 12
ACH580-3BCR/BDR
ACH580 Ultra-Low Harmonic Drives Installation, Operation and Maintenance Manual
Bx12-31
E-Clipse Bypass
Control Panel
for Disconnect Switch
Drive
Control Panel
Bx12-32
UL Type 12
Operating Handle
or Circuit Breaker
WARNING
RISK OF FIRE OR ELECTRIC SHOCK-
The opening of the branch-circuit protective device may
be and indication that a fault current has been
interrupted. All current-carrying parts and other
components protected by this device should be
examined and replaced if damaged. If burnout of a
current element of an overload relay occurs, the
complete overload relay must be replaced.
CAUTION
VOLTAGE MAY BE PRESENT FROM MORE
THAN ONE SOURCE AND SHOULD BE
DISCONNECTED FOR SERVICING.
ATTENTION
PEUT ETRE SOUS TENSION DE PLUS D'UNE
SOURCE D'ALIMENT ELECTRIQUE. COUPER TOUTES LES
SOURCES D'ALIMENTATION AVANT LE DEPANNAGE.
WARNING
!
Wait at least 5 minutes after disconnecting
supply before continuing to work.
Consult the Installation & Start-Up Manual
before working on the frequency converter.
!
ATTENTION!
Attendre au moins 5 min apres sectionnement
de l'alimntation pour travailler sur l'appareil.
Consulter le Manuel d'installation et de mise
end route avant d'intervenir sur le convertisseur
de frequence.

Advertisement

loading