Mitsubishi Electric AE-200A Instruction Book page 35

Air conditioning control system
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

3-2-4. Peakcut Control Status
This section explains how to check the Peakcut control status.
Touch [Energy Mgmt] in the menu bar, and then touch [Peakcut Control Status].
The average electric power consumption (kW) and the control level will appear in the graph.
Note: The [Controller] setting will appear when the [System Exp] setting on the [Unit Info.] screen is set to [Expand]. Switch the
[Controller] setting between [AE200], [AE1], [AE2], and [AE3] to display the data for each AE-200 and AE-50 individually.
Controller
Select [AE200] to display
the data for AE-200, and
select [AE1], [AE2], or [AE3]
to display the data for each
AE-50.
Date
Average electric power
(1) In the [Controller] section, select [AE200] to display a graph for AE-200, and select [AE1], [AE2], or [AE3] to
display a graph for each AE-50.
The most recent measurement data will appear in a graph.
Item
Update
Date
Average electric power
Control levels
WT07190X01
Touch to show the most recent measurement data.
Select the measurement date.
Note: The data of the past three days including the current day can be displayed.
Average electric power consumption (kW) will appear in 30-minute increments.
Note: Average electric power consumption data are stored every hour and half hour. If a power
failure occurs, up to 30-minute worth of data will be lost.
Note: The graph can be displayed only when the Peak Cut method is set to [Electric Amount
Count PLC] or [PI Controller] on the Peak Cut settings screen, accessible via the Web
Browser for Initial Settings.
Peak Cut control level will appear.
Description
35
Update
Touch to show the most
recent measurement data.
Control levels

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aAe-50eAe-200eAe-50

Table of Contents