GE Baker Hughes Masoneilan SVI FF Installation And Operation Manual page 61

Digital positioner
Table of Contents

Advertisement

6. Verify lever is in correct position with valve closed. Adjust rod-ends, if necessary.
Align lever to edge
Figure 31 Lever Alignment
7. Mount the SVI FF with M6-1 screws.
8. Cycle the valve open to close verifying proper components movement and that rod-ends
move free and clear from other components.
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
| 61
Masoneilan SVI FF Instruction Manual
=

Advertisement

Table of Contents
loading

Table of Contents