Procedure; Preparation For Device Connection - GE Baker Hughes Masoneilan SVI FF Installation And Operation Manual

Digital positioner
Table of Contents

Advertisement

Procedure

1. Preparation for Device Connection

Before the SVI FF is connected to the Yokogawa DCS, you must collect some information and
configure the Yokogawa DCS for the SVI FF device connection. This section documents the
steps required.
A. Finding the DD Directory
Depending on the version of the Yokogawa system, the Device Description (DD) files for SVI FF
may not be integrated and installed with the Centum Software installation. Then, the DDs
must be manually integrated in the corresponding directories. Only perform this process
when a new version of the device is being integrated and a new set of DDs are being installed.
When the DD is integrated, it supports all devices of that version. The DD files are located at:
https://valves.bhge.com/resource-center. To access the files:
1. Enter SVI FF in the Search field and the screen below appears (Figure 68).
2. Click Download under SVIFF Rev 2 DD Package and a dialog appears asking whether to
Save File or Open.
3. Select Save File and click OK and the files are saves to the Windows Download directory
for use in the next section.
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Figure 68 Search Results
Masoneilan SVI FF Instruction Manual
| 209
=

Advertisement

Table of Contents
loading

Table of Contents