Start sequence of the drive
INU starts modulation
Drive not ready
&
Drive OFF
MCB closes
DC link charges
Fans switch on
Drive stopped
Drive running
Operation
Conditions for start:
Auxiliary supply on
TEU protective plate mounted
TRU / INU door closed and locked
Drive not grounded
No emergency off active
No fault active
SUPPLY ON command
Enter setpoint
Start command
Operation 93