Phase 2: Synchronization With The Zero Mark - Siemens SINUMERIK 840D sl Function Manual

Hide thumbs Also See for SINUMERIK 840D sl:
Table of Contents

Advertisement

R1: Referencing
15.5 Referencing with incremental measurement systems
Phase 1 is now complete. Reference point approach is continued with Phase 2.
Phase 1: Properties
● Feed override active.
● Feed stop (channel-specific and axis-specific) is active.
● NC stop and NC start are active.
● The machine axis is stopped if the reference cam is not reached within the parameterized
maximum distance:
MD34030 $MA_REFP_MAX_CAM_DIST (max. distance to the reference cam)
See also
Channelspecific referencing (Page 1152)
15.5.5

Phase 2: Synchronization with the zero mark

Phase 2: Graphic representation
Figure 15-5
Phase 2: Synchronization with the zero mark
1160
Function Manual, 01/2015, 6FC5397-0BP40-5BA2
Basic Functions

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 828dSinumerik 840de sl

Table of Contents