Wall Mount Installation - ABB XRC G5 User Manual

Hide thumbs Also See for XRC G5:
Table of Contents

Advertisement

Figure 3-1: Mounting pipe
Legend: Mounting pipe
1
Meter run
2
2-inch x 40-inch Mounting pipe
Screw the mounting pipe into the saddle until it is tight.
Level the mounting pipe:
a. Level and center the pipe and saddle on the top of the meter run. Tighten the saddle-
mounting U-bolt.
b. Level the pipe so that the pipe is perpendicular to the meter run using the saddle
leveling bolts (if available) on the mounting saddle.
Tighten the saddle-mounting U-bolt as tight as possible to avoid vibration-related issues.
Install the XFC
mount instructions supplied in the mounting kit.
Attach the enclosure to the mounting pipe:
a. Hold the enclosure in place against the mounting pipe and insert a U-bolt around the
pipe and through the corresponding holes on the upper mounting bracket.
c.
Add the flat washer and split washer onto the U-bolt, then screw the nut onto the U-
bolt.
d. Repeat steps 6a and 6b for the second mounting bracket.
Raise the XFC
IMPORTANT NOTE: Position the XFC
slope from the externally mounted manifold to the tap valves.
Secure the XFC
vibration-related issues.
For the XFC
G5
: To install the manifold and connect the input lines to the meter run, see section
Direct-mount
installation.
IMPORTANT NOTE: Select a mounting location that allows for easy access, is close to the tap
valves, and complies with all local and national codes.
3 0 | XSE RI ES G5 | 2 10 6 02 6MNAA
G5
or XRC
G5
mounting brackets to the back of the enclosure using the pipe
G5
or XRC
G5
into position on the mounting pipe.
G5
or XRC
G5
in place by tightening the U-bolt nuts. This will help to avoid
3
Saddle
4
U Mounting bolt
G5
or XRC
G5
high enough to allow some downward
3.6

Advertisement

Table of Contents
loading

This manual is also suitable for:

X g5 seriesXfc g5

Table of Contents