Figure 3-6: Typical Rtd Installation - ABB XRC G5 User Manual

Hide thumbs Also See for XRC G5:
Table of Contents

Advertisement

WARNING: Bodily injury. Install electrical wiring according to requirements for the area
classification. Refer to the certification drawing indicated on the device's name tag, and national
and local codes.
IMPORTANT NOTE: This procedure applies to the XFC
support for RTD inputs.
Materials:
 RTD probe with cable and cable gland installed (probe and cable length determined by
technician)
 Nylon tie wraps
Install the RTD probe:
Insert the RTD probe into the thermowell to determine the depth setting for the probe
spring.

Figure 3-6: Typical RTD installation

Use snap-ring pliers to adjust the retaining ring below the spring on the probe. Probe depth
should be set so it is spring-loaded against the bottom of the thermowell.
Figure 3-7: RTD probe connector
Legend: RTD Probe Connector
1
SHLD (Drain wire= Green wire)
2
OUT (White wire)
3
(+) (White wire)
4
(-) (Black wire)
5
IN (Black wire)
6
Cable gland
7
Cord sealing nut
3 6 | XSE RI ES G5 | 2 10 6 02 6MNAA
G5
only. The XRC
8
Cable
9
Retaining ring
10
RTD probe
11
Spring
12
Probe connector
13
Nylon sealing ring
14
Cable nut
G5
does not have onboard

Advertisement

Table of Contents
loading

This manual is also suitable for:

X g5 seriesXfc g5

Table of Contents