4
Parts Replacement and Cleaning Procedure > Removing the PCB > Removing the Finisher Controller PCB
7) Disconnect eight connectors.
x8
9) Remove three screws and then the finisher controller PCB.
x3
4
Parts Replacement and Cleaning Procedure > Removing the PCB > Removing the Finisher Controller PCB
8) Detach the PCB cover in the direction of the arrow.
F-4-104
F-4-104
F-4-106
F-4-106
4-36
F-4-105
F-4-105
4-36