Sample Line Connections; Materials; Instructions; Figure 3-24 Single And Multiple Stream Sample Conditioning Assemblies - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

8) Tighten both nuts.
Single and Multiple Stream Sample Conditioning Assemblies
Figure 3-24

3.14 Sample Line Connections

Following the installation of the sample conditioning module(s), install the sample
tubing from the sample probe to the sample conditioning system and NGC feed-
through assembly.

3.14.1 Materials

3.14.2 Instructions

2101510 Rev. AG
If the sample conditioning module and NGC are located
inside an ENC82, review the following sub section,
Line Connections
information pertaining to this installation.
1/8" SST chromatography grade transport tubing. Length of tubing to be
determined by the technician based on the distance from the sample probe to
the sample conditioning module and the number of sample streams.
2 ea. ferrule and nut (for each sample stream)
1 ea. ¼" NPT to 1/8" reducer or other size as determined from the sample
probe output port (for each sample stream)
1 ea. sample conditioning module transport tubing (supplied with sample
conditioning module).
Be certain that the ends of stainless steel tubing are open
and not restricted.
to NGC Inside of the ENC82, for
Sample
Page 3–23

Advertisement

Table of Contents
loading

Table of Contents