Connecting The External Sample Inlet Line And Drains - ABB Navigator 550 Operating Instructions Manual

Hydrazine analyzer, measurement made easy
Hide thumbs Also See for Navigator 550:
Table of Contents

Advertisement

Navigator 500
Hydrazine analyzer

3.1.4 Connecting the external sample inlet line and drains

Note.
Sample inlet and drain tubing from the funnel is customer-supplied.
Keep sample outlet tubing as short and vertical as possible to enable the sample to drain freely during a calibration routine.
Referring to Fig. 3.4:
1. Connect the sample inlet tubing as follows:
a. For wet-sections without a flowmeter fitted, connect the sample inlet tubing
barbed connector
b. For wet-sections with a flowmeter fitted, connect the sample inlet tubing
B
connector
at the base of sample inlet
flowmeter).
2. Ensure the drain tubing
3. Ensure the 2 drain tubes
H
at the base of the wet-section.
Fig. 3.4 Connecting the external sample lines and drains
10
B
at the base of sample inlet
D
(the inlet tubing is routed through the next entry on wet-sections fitted with a
E
is kept as straight as possible and is routed to a suitable drain.
F
from the constant-head unit
C
.
A
G
are kept as straight as possible and routed through to the funnel
Navigator 500
A
using flexible PVC tubing (
using flexible PVC tubing (
3
/
8
OI/AHM550–EN Rev. A
1
/
in.) ID to
4
in.) ID to barbed

Advertisement

Table of Contents
loading

This manual is also suitable for:

Navigator 500 seriesNavigator 540

Table of Contents