3.37 DC Power Installation

3.37.1 Instructions

1) If the installation includes the optional power switch:
2) If the installation includes the optional equipment enclosure with the optional
power supply:
3) If the installation includes a solar panel connected to a battery:
4) Test power using a multi-meter connected to the J1 terminals of the phoenix
connector:
5) If the NGC8200 has the optional VGA screen, the unit will show "Totalflow Boot
Loader" followed by the navigational screen, when functional.
6) Unit will begin Start-up Diagnostics and oven stabilization. This completes the
hardware installation. Proceed to the next chapter,
unit setup and operation.

3.38 Remote Communication Installation

As remote communication installation is specific to the communication transceiver,
only basic information is supplied here. Additionally, wiring instructions should be
shipped with the unit. Both communication ports (serial port 1 and 2) can function
as RS-232, RS-422 or RS-485.
Table 3–2
PIN
1
2
2101510 Rev. AG
These instructions assume that all external wiring has been
completed to the point where connections have been made to
the field termination connector, but the connector has not
been plugged into the termination panel.
Apply power to switch; turn switch to "ON" position.
Apply power to power supply.
Plug in the charger regulator battery connector.
12 Volt System: voltage is between 11.5 and 16.0 volts (see
24 Volt System: voltage is between 21.0 and 28.0 volts (see
If volts are within range, the power should be disconnected, the phoenix
connector inserted into the termination panel J1 connector and power re-
applied.
During Startup operations, the unit will require:
12 Volt System: 11.5 volts minimum.
24 Volt System: 21.0 volts minimum.
shows serial port pinouts and termination settings.
Table 3–2 Port 1 and Port 2 Pin-Outs/Terminations
RS-232
RS-485
PORT 1
PORT 1 (J8)
(J8)
Power Out
Power Out
Ground
Ground
NGC8206
RS-422
PORT 1
(J8)
Power
Out
Ground
Table
2–4).
Table
2–5).
STartup, to begin
Page 3–77