3.12 NGC Installation

Once the mounting system has been installed, regardless of the type used, follow
these instructions to install the NGC onto the mounting pipe.
Before beginning, review the procedure and the materials required for installation.

3.12.1 Materials

3.12.2 Instructions

1) Position the NGC on top of the 2" pipe stand (see
approximation to correct orientation.
2) If the installation has the optional mounting pipe with flange, ensure the screw
holes in the upper flange align with the holes located in the NGC neck bottom
(see
Page 3–20
OPTIONAL MOUNTING
FLANGE PIPE
2" PIPE COUPLING

Figure 3-20 Shelf Installation

Both the large and small environmental enclosures are
shipped with the NGC mounting system installed inside the
environmental enclosure. The following instructions should be
followed to install the NGC onto the mounting pipe.
Installed mounting pipe
4 ea. 5/16" hex socket screws (optional for use with mounting pipe with
flange kit)
NGC
When positioning the unit, take into consideration the
mounting of the sample conditioning system, conduit
locations and access to the rear end cap of the unit.
Figure
3-22).
For installation inside of an environmental enclosure, the front display of
the unit would normally face left, with the feed-through assembly facing
the front opening of the enclosure. This allows screen visibility, access
WALL SHELF
Figure
3-21), in close
2101510 Rev. AG