Settings and configuration
First sequence parameters (1st Seq .Param.)
To set parameters related to the first sequence, enter the 1st Seq. Param. group.
Following parameters can be adjusted:
1st Set Ie
Start Ramp1
Init Volt1
Curr Lim1
Press Store to save the selected parameter.
Second sequence parameters (2nd Seq .Param.)
To set parameters related to the second sequence, enter the 2nd Seq. Param. group.
The following parameters can be adjusted:
2nd Set Ie
Start Ramp2
Init Volt2
Curr Lim2
Press Store to save the selected parameter.
Third sequence parameters (3rd Seq .Param.)
To set parameters related to the third sequence, enter the 3rd Seq. Param. group.
The following parameters can be adjusted:
3rd Set Ie
Start Ramp3
Init Volt3
Curr Lim3
Press Store to save the selected parameter.
For wiring and operation of the start/stop signals, see Chapter 5, "Connection" under
programmable inputs.
Setting current.
Ramp time for start.
Initial voltage.
Current limit level.
Setting current.
Ramp time for start.
Initial voltage.
Current limit.
Setting current.
Ramp time for start.
Initial voltage.
Current limit.