Joining The Shipping Splits; Procedure - ABB ACS800-07-0610-3 Hardware Manual

Acs800-07 series 500 to 2800 kw
Table of Contents

Advertisement

48

Joining the shipping splits

The busbar systems and wiring harnesses of two shipping splits are joined in the
common motor terminal cubicle (if present) or a busbar joining cubicle. Special M6
screws for fastening the shipping splits together are enclosed in a plastic bag inside
the rightmost cubicle of the first shipping split. The threaded bushings are already
mounted on the post.

Procedure

• Fasten the front post of the joining section with 7 screws to the front frame post of
the next cubicle.
Mechanical installation
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Threaded bushing
Maximum tightening torque:
5 Nm (3 ft.-lbs)
7
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents