Example Of Reverse Projection - ABB PGC2000 Operation And Service Manual

Process gas chromatograph
Table of Contents

Advertisement

"Proj Reverse" is a reverse projection flag that identifies the end of a desired peak or group of peaks.
It is set in the baseline after the end of the peak (see "HBR" in Figure 4-25). With reverse projection,
"Proj Term" is set before the start of the peak—and before "Proj Reverse" (see "HBT" in Figure 4-25).
The system then measures the peak that occurs between HBT and HBR. Line JK in Figure 4-25
represents the baseline.
"Suspend End" permits the operator to suspend automatic baseline determination. It is generally
used when the component peak is badly tailing. "Suspend End" permits you to choose the end-of-
peak determination (see Figure 4-26).
4-25
TIME
Figure 4-25. EXAMPLE OF REVERSE PROJECTION
A
TIME
SUSPEND END ON
SUSPEND END WAS IMPLEMENTED BECAUSE
THE OPERATOR DECIDED THAT "AF" WAS
THE BEST CORRECTED BASELINE.
Figure 4-26. EXAMPLE OF SUSPEND END
H
I
J
K
HBR
HBT
BASELINE FOUND
BUT IGNORED
B
C
F
D
E
SUSPEND END OFF
2000-OSM, F1

Advertisement

Table of Contents
loading

Table of Contents