Installation checklist

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read chapter
the first pages of this manual before you work on the drive.
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. (See
for the installation site
and
Ambient conditions
The drive is fixed properly on an even vertical non-flammable wall. (See
installation.)
The cooling air will flow freely. (See
page 19.)
The motor and the driven equipment are ready for start. (See
Motor selection
ELECTRICAL INSTALLATION (See
For ungrounded and corner grounded systems: The internal EMC filter is disconnected
(screw EMC removed).
The capacitors are reformed if the drive has been stored over two years.
The drive is grounded properly.
The input power voltage matches the drive nominal input voltage.
The input power connections at U1, V1 and W1 are OK and tightened with the correct torque.
Appropriate input power fuses and disconnector are installed.
The motor connections at U2, V2 and W2 are OK and tightened with the correct torque.
The motor cable is routed away from other cables.
The external control (I/O) connections are OK.
The input power voltage cannot be applied to the output of the drive (with a bypass
connection).
Terminal cover and, for NEMA 1, hood and connection box, are in place.
on page 18,
Technical
on page 116.)
Mechanical
on page
21
and
Technical
Planning electrical installation
Mechanical installation: Requirements
data:
Cooling air flow requirements
installation:
Free space around the drive
Planning electrical
data:
Motor connection
and
Safety
on page
Mechanical
installation:
on page 114.)
Electrical
installation.)
Installation checklist
35