GE T60 Instruction Manual page 290

Transformer protection system ur series
Hide thumbs Also See for T60:
Table of Contents

Advertisement

5.5 FLEXLOGIC
Table 5–17: T60 FLEXLOGIC OPERANDS (Sheet 4 of 9)
OPERAND TYPE
OPERAND SYNTAX
ELEMENT:
PHASE OV1 PKP
Phase overvoltage
PHASE OV1 OP
PHASE OV1 DPO
PHASE OV1 PKP A
PHASE OV1 PKP B
PHASE OV1 PKP C
PHASE OV1 OP A
PHASE OV1 OP B
PHASE OV1 OP C
PHASE OV1 DPO A
PHASE OV1 DPO B
PHASE OV1 DPO C
ELEMENT:
PHASE TOC1 PKP
Phase time
PHASE TOC1 OP
overcurrent
PHASE TOC1 DPO
PHASE TOC1 PKP A
PHASE TOC1 PKP B
PHASE TOC1 PKP C
PHASE TOC1 OP A
PHASE TOC1 OP B
PHASE TOC1 OP C
PHASE TOC1 DPO A
PHASE TOC1 DPO B
PHASE TOC1 DPO C
PHASE TOC2to 4 to 6
ELEMENT:
PHASE UV1 PKP
Phase undervoltage
PHASE UV1 OP
PHASE UV1 DPO
PHASE UV1 PKP A
5
PHASE UV1 PKP B
PHASE UV1 PKP C
PHASE UV1 OP A
PHASE UV1 OP B
PHASE UV1 OP C
PHASE UV1 DPO A
PHASE UV1 DPO B
PHASE UV1 DPO C
PHASE UV2 to 3
ELEMENT:
PMU Agg 1 SvEng On
Synchrophasor
PMU 1 CURR TRIGGER
phasor
PMU 1 FREQ TRIGGER
measurement unit
PMU 1 POWER TRIGGER
(PMU)
PMU 1 ROCOF TRIGGER
PMU 1 VOLT TRIGGER
PMU 1 TRIGGERED
ELEMENT:
PMU ONE-SHOT EXPIRED
Synchrophasor one-
shot
PMU ONE-SHOT OP
PMU ONE-SHOT PENDING
ELEMENT:
POTT OP
POTT
POTT TX
(Permissive
overreach transfer
trip)
ELEMENT:
POWER SWING OUTER
Power swing detect
POWER SWING MIDDLE
POWER SWING INNER
POWER SWING BLOCK
POWER SWING TMR2 PKP
POWER SWING TMR3 PKP
POWER SWING TMR4 PKP
POWER SWING TRIP
POWER SWING 50DD
POWER SWING INCOMING
POWER SWING OUTGOING
POWER SWING UN/BLOCK
5-154
OPERAND DESCRIPTION
At least one phase of overvoltage 1 has picked up
At least one phase of overvoltage 1 has operated
All phases of overvoltage 1 have dropped out
Phase A of overvoltage 1 has picked up
Phase B of overvoltage 1 has picked up
Phase C of overvoltage 1 has picked up
Phase A of overvoltage 1 has operated
Phase B of overvoltage 1 has operated
Phase C of overvoltage 1 has operated
Phase A of overvoltage 1 has dropped out
Phase B of overvoltage 1 has dropped out
Phase C of overvoltage 1 has dropped out
At least one phase of phase time overcurrent 1 has picked up
At least one phase of phase time overcurrent 1 has operated
All phases of phase time overcurrent 1 have dropped out
Phase A of phase time overcurrent 1 has picked up
Phase B of phase time overcurrent 1 has picked up
Phase C of phase time overcurrent 1 has picked up
Phase A of phase time overcurrent 1 has operated
Phase B of phase time overcurrent 1 has operated
Phase C of phase time overcurrent 1 has operated
Phase A of phase time overcurrent 1 has dropped out
Phase B of phase time overcurrent 1 has dropped out
Phase C of phase time overcurrent 1 has dropped out
Same set of operands as shown for PHASE TOC1
At least one phase of phase undervoltage 1 has picked up
At least one phase of phase undervoltage 1 has operated
All phases of phase undervoltage 1 have dropped out
Phase A of phase undervoltage 1 has picked up
Phase B of phase undervoltage 1 has picked up
Phase C of phase undervoltage 1 has picked up
Phase A of phase undervoltage 1 has operated
Phase B of phase undervoltage 1 has operated
Phase C of phase undervoltage 1 has operated
Phase A of phase undervoltage 1 has dropped out
Phase B of phase undervoltage 1 has dropped out
Phase C of phase undervoltage 1 has dropped out
Same set of operands as shown for PHASE UV1
SvEng data item in associated control block is on
Overcurrent trigger of phasor measurement unit 1 has operated
Abnormal frequency trigger of phasor measurement unit 1 has operated
Overpower trigger of phasor measurement unit 1 has operated
Rate of change of frequency trigger of phasor measurement unit 1 has
operated
Abnormal voltage trigger of phasor measurement unit 1 has operated
Phasor measurement unit 1 triggered; no events or targets are generated by
this operand
Indicates the one-shot operation has been executed, and the present time is
at least 30 seconds past the scheduled one-shot time
Indicates the one-shot operation and remains asserted for 30 seconds
afterwards
Indicates the one-shot operation is pending; that is, the present time is before
the scheduled one-shot time
Permissive over-reaching transfer trip has operated
Permissive over-reaching transfer trip signal sent
Positive-sequence impedance in outer characteristic
Positive-sequence impedance in middle characteristic
Positive-sequence impedance in inner characteristic
Power swing blocking element operated
Power swing timer 2 picked up
Power swing timer 3 picked up
Power swing timer 4 picked up
Out-of-step tripping operated
The power swing element detected a disturbance other than power swing
An unstable power swing has been detected (incoming locus)
An unstable power swing has been detected (outgoing locus)
Asserted when power swing is detected and de-asserted when a fault during
power swing occurs
T60 Transformer Protection System
5 SETTINGS
GE Multilin

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents