_ Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been reinstalled.
_ Refill cooling system, referring to Section 6B.
_ Upon completion of installation, turn ignition switch ON but en-
gine OFF and check for fuel leaks.
_ Finally, start engine and check for engine coolant leaks.
ENGINE MECHANICAL (J20 ENGINE) 6A4-11