Ignition Switch Inspection; Combination Meter Removal And Installation - Suzuki 2006 SX4 Service Manual

Hide thumbs Also See for 2006 SX4:
Table of Contents

Advertisement

9C-15 Instrumentation / Driver Info. / Horn:
Installation
Reverse removal procedure noting the following.
Tighten steering column mounting nuts referring to Step
2) under "Installation" of "Steering Column Removal and
Installation in Section 6B".

Ignition Switch Inspection

• Check for continuity between terminals at each switch
position. If check result is not as specified, replace
switch.
IG2
ST
B2
IG1
ACC
B1
Terminal
B1
B2
Key
Position
OUT
LOCK
ACC
IN
ON
START
Ignition knob switch
(with keyless start system only)
OFF (ignition knob switch released)
ON (ignition knob switch pushsed)
S6RW0C9306002
K2
P2
P1
K1
ACC
IG1
IG2
ST
K1
K2
Terminal
P1
P2
I5RS0D930003-02

Combination Meter Removal and Installation

Removal
1) Disconnect negative (–) cable at battery.
2) Remove dash side trim (1) and steering column hole
cover (2).
1
3) Remove center ventilation louver referring to Step 1)
and 2) of "Information Display (Clock) Removal and
Installation".
4) Remove combination meter cluster panel (1) pulling
it in arrow direction shown in figure.
5) Remove screws (1) fastening combination meter.
6) Remove combination meter (2) pulling it arrow
direction as shown.
2
Installation
Reverse removal procedure.
S6RW0C9306003
2
I7RW01930007-01
1
I5RW0A930009-01
1
I4RS0A930012-02

Advertisement

Table of Contents
loading

Table of Contents