Pre-Door Install - Wayne-Dalton 800FR Installation Instructions Manual

Face mounted rolling steel storm shelter door with non-tension release automatic closure governor controlled
Table of Contents

Advertisement

Pre-Door Install

1. INSTALL GUIDE ASSEMBLIES
• Locate the guide assemblies such that the "S" dimension exists
between the guides, as shown in Figure 4.
• The "S" dimension is shown on the "DATA SHEET".
• Both guides MUST be on a level line and both guides MUST be
plumb.
• The "S" dimension must be held within 1/8" over the entire height of
guides.
• Guide assemblies are designed to rest on floor.
NOTE: If the bottom of one guide is above floor, see Step 42 on page 33.
Figure 4
Masonry jambs shown, non-masonry jamb Installation is similar.
830872-0001
REV 12/07/2022
ROLLED
ANGLE
GUIDES
©Copyright 2022 Wayne Dalton, a division of Overhead Door Corporation
NOTE: If outside angle is flared, then unbolt the Outside Angle and
the Middle Angle from the Wall Angle. They will be bolted to the Wall
Angle after the curtain installation is complete in Step 21.
"S" Distance
Location
"E" GUIDE
"S" Distance
Location
"Z" GUIDE
Wall
Angle
Middle
Outside
Angle
Angle
Figure 3
6

Advertisement

Table of Contents
loading

Table of Contents