Pre-Installation - Wayne-Dalton 800FR Installation Instructions Manual

Face mounted rolling steel storm shelter door with non-tension release automatic closure governor controlled
Table of Contents

Advertisement

Pre-Installation

VERIFY THAT THE DOOR INSTALLATION can be accomplished before
proceeding:
• Insure the wall opening matches the Opening Width and Height
shown on the "DATA SHEET" and in Figure 1.
• Are the jambs suitable to hold the guides? See jambs details below.
• Are the guides you received suitable for the jambs? Compare the
guide type shown on the "DATA SHEET" with Figure 2.
• Can the guides be installed plumb?
• Measure the length of the guide jamb angle and the height of the
jamb opening. The difference must allow expansion of the guides
1/8" per foot of opening height. Attachment bolts or anchors
must be installed at top of slot on wall angle. See Figure 5.
UNCRACKED, 3000 PSI
MIN., 8" THICK NORMAL
WEIGHT CONCRETE
WEDGE ANCHOR
PVC WASHER &
2 FLAT WASHERS
830872-0001
REV 12/07/2022
1/4" SETBACK
REF
Figure 2
©Copyright 2022 Wayne Dalton, a division of Overhead Door Corporation
Header
Opening
Jamb
Height
Sill
Opening Width
Figure 1
STEEL JAMB
5/16" THICK
36 KSI MIN.
1/4" SETBACK
REF
5

Advertisement

Table of Contents
loading

Table of Contents