NOTE: To insure smooth operation, make sure there is no twist in the hand chain before
connecting the link ends together.
Operator Install (continued)
14. HAND CHAIN AND KEEPER
• Route the hand chain through the chain guide, around the pocket wheel and back through the chain guide.
See Figure 25
• Connect the hand chain ends together as shown in Figure 26 by twisting open the last link on one end of the chain, and
slipping the last link on the opposite end onto the open link.
• Twist open link closed again.
• Mount chain keeper to wall in line with chain approximately 4 feet from floor.
• Loop chain around keeper as shown. See Figure 27. Optional Padlock not provided.
• Install hoist cable.
• With operator installed motor DOWN, attach hoist cable to cam arm hole closest to mounting plate. See Figure 28
• With operator installed motor UP, attach hoist cable to cam arm hole closest to electric box. See Figure 28
NOTE: To insure smooth operation, make sure there is no twist in the hand chain before connecting the link ends together.
4.8
830872-0001
REV 12/07/2022
box. Fig. 20
Hand Chain and Keeper
1) Route the hand chain through the chain guide, around the pocket wheel and back
through the chain guide. Fig. 17
Fig 17
2) Connect the hand chain ends together as shown in Fig 18 by twisting open the last link on
one end of the chain, and slipping the last link on the opposite end onto the open link.
3) Twist open link closed again.
4) Mount chain keeper to wall in line with chain approximately 4 feet from floor.
5) Loop chain around keeper as shown. Fig. 19. Optional Padlock not provided.
MOUNTED
6) Install hoist cable.
MOTOR UP
• With operator installed motor DOWN, attach hoist cable to cam arm hole closest to
mounting plate. Fig. 20
• With operator installed motor UP, attach hoist cable to cam arm hole closest to electric
box. Fig. 20
NOTE: To insure smooth operation, make sure there is no twist in the hand chain before
connecting the link ends together.
©Copyright 2022 Wayne Dalton, a division of Overhead Door Corporation
Hand Chain and Keeper
1) Route the hand chain through the chain guide, around the poc
through the chain guide. Fig. 17
2) Connect the hand chain ends together as shown in Fig 18 by tw
one end of the chain, and slipping the last link on the opposite
3) Twist open link closed again.
4) Mount chain keeper to wall in line with chain approximately 4
5) Loop chain around keeper as shown. Fig. 19. Optional Padlock
6) Install hoist cable.
• With operator installed motor DOWN, attach hoist cable to cam
Section 4: Installation
mounting plate. Fig. 20
• With operator installed motor UP, attach hoist cable to cam arm
box. Fig. 20
NOTE: To insure smooth operation, make sure there is no twist in the
connecting the link ends together.
Fig 18
MOUNTED
MOTOR DOWN
ATTACH
HOIST
CABLE
HERE
Fig 20
Figure 28
Fig 17
• With operator installed motor U
box. Fig. 20
NOTE: To insure smooth operation,
connecting the link ends together.
Fig 19
ATTACH
HOIST
CABLE
HERE
Fig 17
MOUNTED
MOTOR UP
Fig 18
4.8
Figure 25
Fig 17
MOUNTED
MOTOR UP
Figure 26
Fig 18
MOUNTED
MOTOR DOWN
ATTACH
HOIST
CABLE
HERE
Figure 27
Fig 19