Quick Installation And Commissioning Flowchart - ABB ACS480-04-09A8-1 Hardware Manual

Table of Contents

Advertisement

24 Introduction to the manual

Quick installation and commissioning flowchart

Task
Identify the frame size: R0, R1, R2, etc.
Plan the installation.
Check the ambient conditions, ratings and re-
quired cooling air flow.
Unpack and check the delivery.
If the supply network is not a symmetrically
grounded TN-S system, make sure that the drive
is compatible with the grounding system.
Install the drive.
Route the cables.
Measure the insulation of the input cable, motor
and motor cable.
Connect the power cables.
Connect the control cables.
Examine the installation.
Commission the drive.
See
Type designation key (page 36)
Guidelines for planning the electrical installa-
tion (page 45)
Technical data (page 127)
Unpacking the delivery (page 41)
Grounding system compatibility check –
IEC (page 65)
Grounding system compatibility check – North
America (page 91)
Installing the drive (page 41)
Routing the cables (page 55)
Measuring the insulation resistance -
IEC (page 64)
Measuring the insulation resistance - North
America (page 90)
Connecting the power cables – IEC (shielded
cables) (page 71)
Connecting the power cables – North America
(wiring in conduits) (page 97)
Connecting the control cables - IEC (page 74)
Connecting the control cables - North Amer-
ica (page 100)
Installation checklist (page 115)
Refer to ACS480 Quick installation and start-up
guide (3AXD50000047400 [English]) and
ACS480 Firmware manual (3AXD50000047399
[English]).

Advertisement

Table of Contents
loading

Table of Contents