Mechanical installation

See the electrical installation instructions of the drive.

Electrical installation

Connect the external power supply to the +24 V and DGND terminals on the drive. See
the electrical installation instructions of the drive.
Do not chain an external 24 V DC power supply to several drives. Each drive must be
powered by a single 24 V DC power supply, or a separate 24 V DC output of one auxiliary
power source.
1
24VDC (+)
GND (-)
1
External power supply
2
Drive
3
+24 V internal
4
Main power supply
5
+5 V internal

Start-up

To configure the BAPO-01 module:
1. Power up the drive.
2. Set the parameter 95.04 Control board supply to 1 (External 24V).
BAPO-01 auxiliary power extension module 225
2
+24V
DGND
3
4
BAPO-01
5

Advertisement