Appendix C: Setup Of Post Purge - Honeywell S7800A1167 Manual

Keyboard display module
Table of Contents

Advertisement

Fig. 106. Save Changes screen.
11. Use the down arrow to save changes. After pressing the
down arrow, "Getting Data" is displayed.
12. Use down arrow to save changes.
"Getting Data" is displayed.
The following steps are to confirm your selections.
Fig. 107. Confirmation Acknowledgement screen.
13. Press ENTER to acknowledge.
Fig. 108. Confirmation Correct screen.
14. Use the down arrow to confirm correct.
NOTE: Using the up arrow during this step will take you back
to the beginning of the setup routine.
"Getting Data" will be displayed.
Fig. 109. Confirm screen.
15. Press Enter.
Fig. 110. Confirm Correct screen.
16. Use the down arrow to confirm correct.
17. Use the down arrow to confirm correct.
"Getting Data" will be displayed.
Fig. 111. Setup Done screen.
18. Go to the relay module and press and hold the RESET
button for five seconds to program the Valve Proving
setup into the relay module.
7800 SERIES S7800A1167 KEYBOARD DISPLAY MODULE
The Release Reset screen will appear on the KDM.
Fig. 112. Release Reset screen.
Changing the Valve Proving features is still possible. With the
relay module in Start Switch, scroll to the Setup line and enter
the password to change the settings.
Once the system is in operation, the settings of the Valve
Proving can be viewed un Diagnostics, using your S7800
Keyboard Display Module (KDM).
APPENDIX C
Setup of Post Purge
NOTE:
An S7800A1167, Keyboard Display Module (KDM), is
required for the setup of the RM78XX Post Purge Timing.
When the RM78XX is installed and powered, "STANDBY" will
be shown on the first line of the display (Fig. 114).
Fig. 113. Setup Needed screen.
1. Scroll down until "Setup" is displayed in the second line.
2. Enter the setup sub-routine by pressing the far right key
on the display.
Fig. 114. Entering the setup sub-routine.
The second line reads "BC Password".
3. Use the up/down arrows to enter the first number, 7.
4. Use the far right key to shift over one space.
5. Use the up/down arrows to enter the second number, 8.
6. Press Enter (left and right arrows simultaneously).
7. To select the next screen, press the down arrow key;
"Getting Data" will be momentarily displayed, followed by
the screen shown in Fig. 119.
IMPORTANT:
You will need to scroll through the Valve Proving Test
Setup (see Appendix B) to get to this screen.
Fig. 115. Setting Post Purge time.
35
65-0311—02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7800 series

Table of Contents