Chapter 2 Installing the MQAM

Installation Process Summary

This section provides the installation process and lists the detailed procedures in this
guide that correspond with each process step.
Important: To ensure proper installation, read this entire guide before starting
installation and then follow these processes in the order shown.

Before You Begin

This process assumes that you have already installed the MQAM software on the
DNCS. Refer to the release notes and installation instructions for your version of
MQAM software for detailed instructions. Also be sure that you have access to the
Digital Network Control System Online Help for your system release before installing
the MQAM.

MQAM Installation Processes

The following process summary provides the recommendations for an MQAM
installation.
Stage
1
2
3
4
5
12
Process
Review system requirements and
technical specifications.
Consult your Bandwidth Management
Plan and the MQAM input and output
specifications to allocate your
bandwidth resources properly.
Unpack and inspect the MQAM.
Install the MQAM into a rack.
Connect the MQAM to an earth
ground and then the power source.
For the 120/230 V AC MQAM,
connect the power cord.
For the 48V DC MQAM, connect
the power wires to the DC power
inlet.
See Procedure
Installation and Operation
Requirements (on page 86)
Technical Specifications (on page 85)
Installation and Operation
Requirements (on page 86)
Technical Specifications (on page 85)
Unpack and Inspect the MQAM (on
page 14)
Install the Modulator Into a Rack
(on page 15)
Connect Power Sources (on page 16)