Powering Down The Css; Booting The Css For The First Time - Cisco 11500 Series Hardware Installation Manual

Content services switch
Table of Contents

Advertisement

Powering Down the CSS

Powering Down the CSS

Booting the CSS for the First Time

Cisco 11500 Series Content Services Switch Hardware Installation Guide
3-2
For a DC CSS, switch on the applicable circuit breakers for the power source.
Then on the CSS, toggle the power switch to the 1 (on) position.
See
Figure 2-13
See
Figure 2-15
each power supply. Power on all of the supplies in the CSS. The I/P OK
and DC OK LEDs light up on each power supply. If either LED remains
unlit, refer to Appendix C, Troubleshooting.
The CSS starts the boot process. Proceed to
To shut down the CSS gracefully and avoid introducing lost or fragmented files,
always use the shutdown command prior to removing power from the CSS.
For example:
(config-boot)# shutdown
Once the CSS shuts down all processes, you can remove power from the CSS.
When the CSS initially boots up, it:
Performs hardware diagnostics.
Prompts you to:
Enter the software license key
Configure the IP address, subnet mask, and default gateway for the
Ethernet Management port, used for CSS configuration and management
only; this port does not route traffic
Change the default administrative login name ( admin ) and password
( system )
Password-protect the Offline Diagnostic Monitor (OffDM) menu
Chapter 3
for the location of the CSS 11503 DC power switch.
for the location of the CSS 11506 DC power switch for
"Booting the CSS for the First
Booting and Configuring the CSS
Time".
78-13884-03

Advertisement

Table of Contents
loading

Table of Contents