Prepare And Install The Probes - GE Xcellerex XDM Series Operating Instructions Manual

Table of Contents

Advertisement

6.4

Prepare and install the probes

Introduction
This section gives information on how to prepare and install the probes into the disposable
bag. This section is relevant for the Plus and Plus Flex bag assembly.
In this section
Section
6.4.1 Calibrate the pH probe
6.4.2 Prepare the conductivity probe
6.4.3 Autoclave probe sheath assembly
6.4.4 Insert probes into the disposable bag
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
6 Preparation
6.4 Prepare and install the probes
See page
158
163
165
168
157

Advertisement

Table of Contents
loading

Table of Contents