Cisco ONS 15454 Unpacking And Installing page 8

Four-shelf and zero-shelf bay assembly
Hide thumbs Also See for ONS 15454:

Advertisement

Installation Instructions
Slab Floor Plan
Figure 4
Slab floor section for local
32X DS1 or DS3 Cables
Fiber
openings
A side DC feed, 2x #2 AWG,
wrapped at floor opening.
(can require a larger gauge
wire depending on distance)
Rack ground
feed wire, #4 AWG
Figure 5
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
8
Power
Rack Cutout
(30.69)
Slab base fiber routing
32X DS1 or DS3 Cables
B side DC feed, 2x #2 AWG,
wrapped at floor opening.
(can require a larger gauge
wire depending on distance)
Rack ground
feed wire, #4 AWG
Fiber
openings
Guard rail
cover
78-13271-05