Cisco RP Series Installation Manual page 29

Rack and metered input pdu
Hide thumbs Also See for RP Series:
Table of Contents

Advertisement

Installing the Cisco R42612 Rack
This chapter contains the following sections:
Securing the Cisco R-Series Rack to the Floor
For information about how to unpack and place the Cisco R42612 rack, see
on page
room at the intended location, see the footprint diagram,
Complete the following steps to lower the leveling feet and install the front stabilizer bracket:
Procedure
Step 1
Use a flat-blade screwdriver to lower each of the leveling feet so that they touch the floor. The rack casters
support the weight of the rack, while the leveling feet prevent the rack from rolling.
Caution
Step 2
Remove the stabilizer plate from the bottom floor of the rack.
Step 3
Attach the stabilizer plate to the front of the rack as shown in the following figure.
Securing the Cisco R-Series Rack to the Floor, on page 27
Joining Cisco R-Series Racks Together, on page 29
Installing Devices in the Rack, on page 32
Installing the Grounding Kit, on page 32
17. Once the rack is off the pallet, roll it to the desired location. To ensure that you have enough
Unless you are moving the Cisco R42612 rack, the leveling feet should always be extended.
C H A P T E R
Space and Clearances, on page
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
4
Unpacking a Cisco R-Series Rack,
7.
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

R42612 r seriesRack2-ucsRack2-ucs2Rack2-ucs2-int

Table of Contents