Site Preparation
Task No.
3
4
5
6
Activity
Power evaluation:
• Input power type
• Power receptacles (verify
that the power supply
installed in the chassis has
a dedicated AC source
circuit)
• Receptacle proximity to
the equipment
• Dedicated circuit for
power supply
• Dedicated (separate)
circuits for redundant
power supplies
• Uninterruptable power
supply (UPS) for power
supplies
Grounding evaluation:
• Circuit breaker size
• Ground
Cable and interface equipment
evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment
(transceivers)
Electromagnetic interference
(EMI) evaluation:
• Distance limitations for
signaling
• Site wiring
• Radio frequency
interference (RFI)
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
Verified By
Time
Site Preparation Checklist
Date
15