Cisco RP Series Installation Manual page 22

Rack and metered input pdu
Hide thumbs Also See for RP Series:
Table of Contents

Advertisement

Safety Guidelines
Table 3: Cisco R42612 Accessories
PID
RACK2-JOIN-001
RACK2_GRND-001
RACK_BLANK-001
RACK-CBLMGT-001
RACK-CBLMGT-003
RACK-CBLMGT-011
RACK-FASTEN-001
RACK-FASTEN-002
Safety Guidelines
Before you move the Cisco R42612 rack cabinet off the pallet and to its final location, read the following
important safety guidelines.
Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to
ensure that the system remains stable. The following guidelines are provided to ensure your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the
Warning
Make sure that your equipment rack is properly ventilated.
Warning
After installing system components in a rack, never pull more than one component out of the rack on its slide
assemblies at one time. The weight of more than one extended component could cause the rack to tip over
and injure someone.
Warning
Make sure that your rack is bolted to the floor.
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
20
heaviest component at the bottom of the rack.
unit in the rack.
Quantity
Item
1
Cisco R42612 joining kit
1
Cisco R42612 grounding kit
1
Blanking panel
1
D-ring
1
Brush strip
10
Velcro straps
100
Mounting screws, M6
50
Cage nuts, M6
Unpacking the Rack

Advertisement

Table of Contents
loading

This manual is also suitable for:

R42612 r seriesRack2-ucsRack2-ucs2Rack2-ucs2-int

Table of Contents