Replacing The Lcd Indicator - ABB ProcessMaster FEP611 Operating Instructions Manual

Table of Contents

Advertisement

10.3 Replacing the LCD indicator

1
A
B
1
5
Fig. 52: Replace LCD indicator
A Integral mount design B Remote mount design
1 Housing cover 2 Fixing screws for LCD indicator 3 LCD indicator 4 Connector 5 Fixing screws for housing cover (4x)
Change from one to two columns
NOTE
If the O-ring gasket is seated incorrectly or damaged,
this may have an adverse effect on the housing
protection class.
Follow the instructions in chapter "Opening and closing the
terminal box" on page 18 to open and close the housing
safely.
The LCD indicator can be replaced in the event of a
malfunction.
Component
LCD indicator (HMI).
Applicable for integral and remote
mount design.
Change from two to one column
2
Order number
3KQZ407125U0100
4
4
Replace the LCD indicator as follows:
1. Switch off the power supply.
2. Unscrew / remove the cover.
3. Loosen the screws for the LCD indicator (only on integral
mount design).
4. Remove the LCD indicator.
5. Pull the connector out of the electronic.
6. Plug in the connector of the new LCD indicator. Ensure
that the cable harness is not damaged.
7. Insert the LCD indicator and screw on /replace the cover.
8. Switch on the power supply.
ProcessMaster FEP610, HygienicMaster FEH610 | OI/FEP610/FEH610-EN Rev. B 73
3
3
G12030

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents