Installing The Sm/Lcm; Overview; Opening The Housing; Installing The Module - Cisco GS7000 Installation And Operation Manual

Gainmaker node seg2way status monitor/local control module
Table of Contents

Advertisement

Chapter 2 Installation

Installing the SM/LCM

Overview

You must perform the following steps to install the SM/LCM in the Model GS7000
Node.
1
Open the node housing.
2
Install the SM/LCM into the housing lid.
3
Close the node housing.
The following sections describe each of these steps in detail.

Opening the Housing

Open the housing as follows.
1
Remove the bolts securing the lid to the base.
2
Carefully open the lid to allow access to the inside of the housing.
3
Inspect gaskets on the cover flange and on the test port plugs.
4
Replace any gaskets showing signs of wear (cracked, twisted, pinched, or dry)
with new, silicon-lubricated gaskets.

Installing the Module

Complete the following steps to install the SM/LCM into the node lid.
1
Inspect the pins on the electrical connector on the rear panel of the SM/LCM
module prior to inserting the module in the node.
Note: If the pins are not straight and level, the module should be returned to the
factory. Refer to Chapter 5, Customer Support Information, for information on
obtaining support and returning products.
12
CAUTION:
Make sure that all pins on the connector are straight and also level, i.e., they
are all at the same height. If not, damage may result to the connector pins
upon installation, installation may be impeded, or the module may not
function properly.
4022871 Rev C

Advertisement

Table of Contents
loading

Table of Contents