Assembly - Grizzly G0796 Owner's Manual

Vertical mill w/power feed & dro
Table of Contents

Advertisement

Assembly

The machine must be fully assembled before it
can be operated. Before beginning the assembly
process, refer to Needed for Setup and gather
all listed items. To ensure the assembly process
goes smoothly, first clean any parts that are cov-
ered or coated in heavy-duty rust preventative (if
applicable).
Assembly of the mill consists of installing the
loose components listed in the inventory section.
This will take approximately 15 minutes.
To assemble mill:
1.
Remove ball handle nuts from X- and Y-axis
leadscrews, slide ball handles onto lead-
screws, and secure with ball handle nuts (see
Figure 15).
Note: Tighten the ball handle nuts just until
they are snug. Overtightening could increase
the wear of the moving parts.
2.
Thread revolving handles into small end of
ball handles (see Figure 15) and tighten
them with 14mm wrench.
Figure 15. Ball handle installed on X-axis
leadscrew.
-24-
3.
4.
Ball
Handle
Ball
Handle
Nut
Revolving
Handle
Slide Z-axis crank onto end of Z-axis
leadscrew, as shown in Figure 16.
Z-Axis
Crank
Figure 16. Z-axis crank installed.
Move table all the way forward, using Y-axis
handwheel, then attach rear way cover with
four pre-installed cap screws, as shown in
Figure 17.
Cap
Screws
Figure 17. Rear way cover installed.
Model G0796/G0797 (Mfd. Since 1/18)

Advertisement

Table of Contents
loading

This manual is also suitable for:

G0797

Table of Contents