Preparation And Startup; Site Preparation; Control Station Mounting; Noise Protection - Honeywell 900 User Manual

Control station
Table of Contents

Advertisement

Preparation and startup

Site Preparation

Site Preparation
The cable that connects the Control Station to the controller module contains low voltages. Keep the cable
away from high voltage wires that can cause interference.

Control Station Mounting

See HC900 Control Station Installation document #51-52-33-157.

Noise Protection

See document 51-52-05-01, How to Apply Digital Instrumentation in Severe Electrical Noise
Environments.

How to configure your Control Station

The Control Station is shipped from the factory unconfigured. Use Honeywell's Station Designer
application to configure your Control Station.
The overall steps for configuration are as follows.
Step
1
Using Station Designer application, open .sds file, add device, update IP address and create
data tags from your HC900's .cde configuration file.
2
In Station Designer, build custom displays to be used by Control Station for viewing and
interacting with your HC900 Controller process.
3
In Station Designer, assign data tags to the custom displays.
4
Save the Station Designer configuration as an .sds file.
5
Download the .sds file via USB or Ethernet to the Control Station.
6
Your Control Station is now configured and ready to use.
4
Preparation and startup
900 Control Station User Guide
Action
Revision 9
May 2014

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents