NETGEAR ReadyNAS 102 Hardware Manual page 34

Readynas os 6 desktop storage systems
Hide thumbs Also See for ReadyNAS 102:
Table of Contents

Advertisement

Memory test. Performs a memory test. The memory test runs for 8hrs. The current status
and the pass or fail result is reported using the storage system LEDs, as described in the
following table:
Memory Test State Power LED Disk 1 LED Disk 2 LED Backup LED
1st hour
2nd hour
3rd hour
4th hour
5th hour
6th hour
7th hour
8th hour
Result: fail
Result: pass
Test disk. Performs an offline full disk test. This process can take four hours or more,
depending on the size of your disks. Any problems are reported in the system logs. For
more information about viewing the system logs, see the ReadyNAS OS 6.2 Software
Manual, which is available at http://support.netgear.com/product/ReadyNAS-OS6.
To access the boot menu:
1.
Power off your storage system.
2.
Using a straightened paper clip, press and hold the Reset button.
3.
Press the Power button.
The system powers on.
4.
Continue to press the Reset button until the Power button LED, USB and backup status
LED, disk 1 LED, and disk 2 LED light.
5.
Press the Backup button to scroll through boot mode options.
ReadyNAS OS 6 Desktop Storage Systems
Off
Off
Off
Off
Off
Blinking
Off
Blinking
On
Off
On
Off
On
Blinking
On
Blinking
Blinking
Blinking
On
On
NETGEAR ReadyNAS 202
34
Off
Blinking
Blinking
Off
Off
Off
Blinking
Blinking
Off
Blinking
Blinking
Off
Off
Off
Blinking
Blinking
Blinking
Blinking
On
On

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents