③ Installation location and space requirements
• When installing the repeater, select an appropriate site near a workstation (server) that
provides an ease of maintenance (do not select a location above the ceiling or basement of
an ordinary office room). Also, ensure that the front/rear, left/right, and upward
clearance requirements indicated below are met. Note that the repeater requires an AC
power source. Therefore, furnish a grounded outlet.
200
Upward
100
<Front view>
Note: The clearance from the front panel surface

Figure 8-60 Repeater Installation Space Requirements

• Do not use the repeater in a dusty location.
• The air intake and air discharge ports are provided in the bottom and top of the repeater,
respectively. Do not cover such openings.
• For ease of maintenance, it is recommended that you install a telephone near the repeater
installation site.
• Furnish the repeater with an independent power source that cannot possibly be switched
off inadvertently. If the repeater is OFF, no communication can be established.
④ Setting the SQE switch
See "Table 8-16 SQE Switch Settings."
100
Rear
100
Front
(Unit: mm)
100
<Top view>
should be as great as possible.
8-59
8 APPENDIXES
Rating: 100 VAC±10%
Normal state: 0.07 kVA
Rush state: 10 A
Plug with two current-carrying
contacts and a ground contact
15 A 125 V
(JIS C 8303)