4.17

Performing a Visual Inspection

Introduction
Before starting up the system, perform a visual inspection of all hardware, cables and power
supply. This procedure should be performed with the entire system turned OFF
.
Warning
!
Before starting to work on the HiPath 1190, make sure the system is grounded and
disconnected from all power sources.
Follow all guidelines to protect the system from electrostatic discharge (see "Safety
Information: Caution" on page 1-3).
Visual Inspection Procedure
Step
1.
Compare the installation position of
modules on the slots against the
installation diagram.
2.
Check to see that all modules are
securely and properly attached.
3.
Check the network's line voltage.
Table 4-8
Visual Inspection Procedure
A31003-K1160-S100-03-7620
Service Manual
Procedure
Performing a Visual Inspection
Aids/
Notes
Module Installation
Diagram.
See "System Data"
on page 2-1.
Multimeter.
Installation
Measure
Make the appropriate
corrections
to the modules and notify
the appropriate person.
Attach or secure modules
as needed.
Verify voltage at power
source.
4-59