Installation
Installation of Expansion and Option Modules
Assembly Diagram
Figure 4-26
Installing a CTR- U
4.7.7.3
On the HiPath 1190/1190R
Installation Procedures
Step
1.
Turn off the power supply.
2.
Remove the system's front cover.
3.
Disconnect the Main Distribution Frame's cables from the MB.
4.
Move the module's latch as shown in Figure 4-12.
5.
Remove MB.
6.
Attach the module to the appropriate connector on the CPU.
7.
Insert the MB into the system.
8.
Move the module latch back to secure module.
9.
Connect the Main Distribution Frame's cables.
10.
Reassemble the entire set.
4-32
HiPath 1150 Module
P0/E
Procedure
A31003-K1160-S100-03-7620
Service Manual