Operator control (software)
6.2 Project
Operating sequence
1. Connect to a control system.
2. Open a project.
Figure 6-40
AMM with project dialog (ONLINE)
3. In the lower window of the project dialog, all files (Alarm texts, EasyScreen, etc.) are
displayed that are in the control system.
122
SINUMERIK Integrate Access MyMachine /P2P (PC)
Operating Manual, 11/2016, A5E39356962B AA