Additional Installation Equipment - GE Sievers InnovOx Operation And Maintenance Manual

On-line toc analyzer
Hide thumbs Also See for Sievers InnovOx:
Table of Contents

Advertisement

Chapter 4: Installation
Accessories included:
• Reagent, dilution water, check standard tubes (and tubing weights and fittings)
• Vial port tube and fittings
• Waste tube
• 5/32 in. Allen
• Squeeze bottle
• Metal dowel (for NDIR leak testing)
• Spare reactor seals (2)
• 2 L bottle for oxidizer preparation
• 3.5 gal carboys for acid and oxidizer
• 1.0 gal carboy for check standard
• 5 gal carboy for dilution water
• Tubing for sample inlet (10 ft.)
• PVC sample control valves (2 or 5, depending on the Analyzer configuration)
• USB flash memory drive
• Two (2) PVC conduit connectors ("strain relief" hubs) for conduit wiring
• Sealing washers for PVC conduit connectors
• Terminal ring for AC conduit ground wire, 16-14 AWG
• Ferrites for I/O cable and Ethernet cable
• Grounding wrist strap
• Level sensors for reagents, dilution water, and check standard (if Fail Safe Accessory was ordered)
• Mounting Stand mounting hardware for Analyzer and Filter Panel (if Mounting Stand Accessory was
ordered)
• Extra tubing
• Extra fittings
Certificate of Performance

Additional Installation Equipment

To install the InnovOx On-Line TOC Analyzer, you will also need to provide the following equipment:
Mounting hardware to support the Analyzer (see "Step 3: Select a Location for the Analyzer" on
page 67.)
GE Analytical Instruments ©2012
®
wrench (hex key), for reactor valve
66 of 238
DLM 68100-06 EN Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents