Chapter 7: Operation with the Filter Panel
6.
Go to the Stream (setup) screen (Setup Tab > Online > Configure Online) for the stream where the Filter
Panel is installed.
7.
Press the Flush/Blowback Setup button. The Flush/Blowback Setup screen appears.
8.
Press the Blowback Pulses button. Enter the number of pulses (0 through 10) on the keypad that
appears to the right, and then press Enter.
9.
Press the Blowback Delay button. Enter the delay time in seconds (0 through 300) on the keypad that
appears to the right, and then press Enter.