4.14
Switching on the server node(s)
V
CAUTION!
Follow the safety instructions in chapter
●
page
31.
Ê If applicable, connect all external cables to the server node.
Figure 42: Controls and indicators of the server node
1 ID indicator
Ê Press the On/Off button either on the rear or on the corresponding front
panel to start up the server node.
The power-on indicator is lit green and the ID indicator is off.
I
For more information, refer to section
CX400 S1
Upgrade and Maintenance Manual
Basic hardware procedures
"Important information" on
2 On/Off button / Power-on indicator
"Front panel" on page
205.
75