Concluding Steps - Fujitsu PRIMERGY CX400 S1 Upgrade And Maintenance Manual

Server enclosure
Table of Contents

Advertisement

Linking boards

10.1.2.5 Concluding steps

Perform the following procedures:
"Installing the midplane" on page 155
Ê
"Installing the power distribution module" on page 57
Ê
Ê Install both fan modules as described in section
on page
147.
"Installing the power supply module" on page 82
Ê
"Closing the server enclosure" on page 61
Ê
"Installing the server node in the server enclosure" on page 65
Ê
"Mounting the server enclosure in the rack" on page 67
Ê
"Switching on the server node(s)" on page 75
Ê
164
Upgrade and Maintenance Manual
"Installing the fan module"
CX400 S1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents