Fujitsu ETERNUS DX200 S3 Configuration Manual page 120

Disk storage system
Hide thumbs Also See for ETERNUS DX200 S3:
Table of Contents

Advertisement

Chapter 6
Monitoring Settings
6.6
Transmission Test Execution
4
Click the [Send Test E-Mail] button.
5
Check that the test mail is sent to the e-mail addresses that are set.
For details on the event code and message of the test mail, refer to "Message List".
FUJITSU Storage ETERNUS DX100 S3/DX200 S3 Disk storage system Configuration Guide (Basic)
120
Copyright 2014 FUJITSU LIMITED
P3AM-7652-02ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx100 s3

Table of Contents