Figure 003-1 Connection Of Rack Parts And Base; Nap - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003

Sheet 1/37
Installation of Main Equipment
Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch
Rack-Mounting or Desk Top installation.
1. Floor Standing Installation
(1) Connect the RACK PARTS to the rear side of the BASE with 4 bolts provided.
REAR

Figure 003-1 Connection of RACK PARTS and BASE

ND-45492 (E)
RACK PARTS
BASE
CHAPTER 3
Page 23
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents