NAP 200-003
Sheet 13/37
Installation of Main Equipment
(10) AC CORD-B and AC Power Cable Wiring
(a) The AC CORD-B and the AC Power Cable Wiring to the FG, NEUTRAL and LINE terminals inside
the BASE are shown in
TO
GROUND TERMINAL
FRONT
Figure 003-11

Figure 003-11 AC CORD-B and AC Power Cable Wiring

ND-45492 (E)
(for details of wiring to the terminals, see
SEE FIGURE 003-12
Figure
003-12).
PIM
AC CORD-B
PIM
BASE
3P AC POWER CABLE
CHAPTER 3
Page 35
Revision 2.0